Choosing a development partner is a high-stakes decision made with very little information. Every agency website says the same things, every portfolio looks competent, and the differences that matter are invisible until you are three months in.

These are the questions that surface them earlier.

The question that reveals most

"What would you talk me out of?"

Most buyers arrive with a request larger than what they need. You ask for an app; a faster mobile site would solve it. You ask for custom software; an existing product covers ninety percent.

A supplier managing a sale agrees with all of it. A supplier managing an outcome pushes back, explains why, and quotes for the smaller thing.

That conversation costs them revenue, which is exactly why it is a reliable signal. If every suggestion you make is met with enthusiasm, be careful.

"Who will actually write the code?"

In larger agencies the person who impresses you in the pitch is frequently not the person who builds it. Information gets lost across that handoff, and you find out at delivery.

Ask to meet the engineer before signing. In a small team, the person scoping should be the person building — that is the main practical advantage of a small team and it is worth confirming rather than assuming.

Follow up with: "will they be working on anything else at the same time?" A developer split across three projects is three times slower on each, and that is rarely disclosed.

"What happens if we want to leave?"

The answer should be immediate and unhesitating: you own the code, the repository, the hosting accounts, the domain and the documentation, and a competent team could take over.

Suppliers who retain clients through dependency rather than quality get vague here. The specific things to watch for:

  • Hosting that can only be accessed through them
  • A repository they own, with you as a guest
  • No documentation, so the knowledge lives in their heads
  • A domain registered to them rather than to you

Get ownership written into the agreement before work starts. Afterwards it is a negotiation.

"Can I see something live?"

Screenshots prove nothing. Ask for URLs you can open now, on your phone.

Then check the things a portfolio page will not tell you:

  • Does it load quickly on mobile data?
  • Does it work at narrow widths?
  • Is there an obvious way to contact the business?
  • Does it rank for anything? A quick search tells you.

If most of the portfolio is unavailable, under NDA or "no longer live", probe that. Some of it will be legitimate; all of it is a pattern.

"Tell me about a project that went badly."

Every supplier with real history has one. The useful answer describes what went wrong, what it cost, and what they changed afterwards.

The unhelpful answer is a deflection, or a humble-brag about a client being too ambitious. A supplier with no such story is either very new or not being candid.

"What is not included?"

Proposals are written to look complete. The gaps are predictable: content, hosting, third-party licences, maintenance after launch, revisions beyond some number, and training.

Ask explicitly, and get the answer in writing. This determines what you are invoiced for in month three.

"How do you handle changes?"

Requirements change. That is normal and frequently correct. The question is how it gets handled.

A good answer describes a trade: "that adds a week, or it replaces this other item." A bad answer either refuses all change or absorbs everything cheerfully while the timeline quietly stops meaning anything.

On pricing

A fixed price on a vague scope is not protection. It feels safe and produces a contract that fights every change, with both sides arguing about what was implied.

When scope is genuinely unclear — normal at the start — a scoped first phase at a fixed price, then iterations, works better for both parties.

The cheapest quote is frequently the most expensive. Usually not because the supplier is dishonest, but because the cheap quote is scoped more thinly and the difference returns as change requests.

Compare line items, not totals. A quote with a written scope is comparable; a figure in an email is an opening position.

Warning signs

  • Guaranteed Google rankings. Nobody can guarantee these. It is the clearest indicator of an unserious SEO offering.
  • No written scope. If what you are buying is not written down, you cannot tell whether you received it.
  • Full payment up front. Staged payments against milestones protect both sides.
  • Reluctance to discuss maintenance. Software needs ongoing work; a supplier treating launch as the end has not thought about month six.
  • Unverifiable claims about team size. Directory listings for agencies are frequently scraped and wrong. Ask directly, and ask to meet people.
  • No questions about your business. A supplier who does not interrogate your assumptions is planning to build what you said rather than what you need.

Green flags

  • They ask more questions than they answer in the first call
  • They propose something smaller than you asked for
  • They tell you a part of your idea is weak
  • They show you a live project and point out something they would do differently now
  • They explain what could go wrong before you ask
  • They have an opinion about maintenance

Before signing, get in writing

  1. Scope — what is included, and explicitly what is not
  2. Timeline with milestones you can check against
  3. Payment schedule tied to those milestones
  4. Ownership of code, repository, accounts and domain
  5. What happens after launch — support terms and cost
  6. Change process — how additions are priced and agreed

Six items. They take an hour to agree and they prevent the overwhelming majority of disputes.

A reasonable process

  1. Write down the problem, not the solution. "Patients can't book outside office hours" is more useful than "we need an app".
  2. Give three suppliers the same problem description.
  3. Compare how they respond, not what they quote.
  4. Check live links yourself, on a phone.
  5. Meet whoever will build it.
  6. Start with a small first phase where you can.

That last point is the strongest protection available. A first phase that ships tells you more about a supplier than any reference, and it limits what a wrong choice costs.

If you want a straight answer on a project — including whether you should be building it at all — describe it to us.